|

Please
Note:
The “Wrap & Pack” methods shown below do
require a
little more effort and good,
clean materials but your
reward
(with rare exception) will be undamaged pipes.
|
|
|
|
PICTURE 1

PROPER SIZE BOX WILL PROVIDE
2" - 3" OF "CUSHION SPACE" AROUND
ALL SIDES & ENDS OF PIPES
|
|
PICTURE 2

CUT CARDBOARD "FLOOR"
SAME APPROXIMANT
SIZE OF BOX
|
|
PICTURE 3

FILL BOTTOM OF BOX WITH
2" - 3" OF "CUSHION" MATERIAL - PLACE
"FLOOR" ON TOP OF MATERIAL.
|
|
PICTURE 4

WRAP EACH PIPE INDIVIDUALLY
WITH SEVERAL LAYERS OF
"HEAVY" BUBBLE WRAP OR
EQUIVALENT MATERIAL
|
|
PICTURE 5

PLACE PIPES ON "FLOOR" - CUT 6"
PARTITIONS PLACE BETWEEN PIPES
AND AT ENDS OF PIPES
|
|
PICTURE 6

FILL ALL VOIDS AROUND PIPES &
PARTITION WALLS
|
|
PICTURE 7

CUT & PLACE SECOND "FLOOR"
OVER TOP OF PIPES
|
|
PICTURE 8

FILL OVER SECOND "FLOOR"
WITH 2" - 3" OF CUSHION MATERIAL
|
|
PICTURE 9

PROPER AMOUNT OF CUSHION MATERIAL FILL.
|
|
PICTURE 10

INCLUDE ANY PAYMENTS, SHIPPING DOCUMENTS, ETC.
|
|
PICTURE 11

TAPE BOX TIGHT / ATTACH SHIPPING LABELS
|
|
To return to previous page click
the back button on your browser. |